Burgos Roads Construction and Structural Excavation Works – Phase 2

Project Description

The Burgos Wind Farm Project is located in Brgy. Kapurpurawan, Burgos, Ilocos Norte. The project consists of fifty (50) wind turbine generators and is intended to cater the power needs of
Northern Luzon. The Project was implemented on May 23, 2014.

The Stage 2 of the project was completed on November 2014. It includes the following scope
of works:

  • Construction of Access Roads with a total
    length of 7.755 km;
  • Leveling with excavation and embankment of
    crane pads and platforms;
  • Foundation Excavation of Wind Turbine
    Generators.

Client: First Balfour

Status: Completed