Burgos Roads Construction & Structural Excavation Works

Project Description

The Burgos Wind Farm Project is located in Brgy. Kapurpurawan, Burgos, Ilocos Norte.  The project consists of fifty (50) wind turbine generators and is intended to cater the power needs of Northern Luzon.

The Project was implemented on September 2013.

The Stage 1 of the Project was completed on March 31, 2014.  It includes the following scope of works:

  • Construction of Access Roads with a total length of 7.755 km;
  • Leveling with excavation and embankment of crane pads and platforms of 19 WTGs;
  • Foundation Excavation of Wind Turbine Generators.

The Stage 2 of the project was completed on November 2014.  It includes the following scope of works:

  • Construction of Access Roads with a total length of 7.755 km;
  • Leveling with excavation and embankment of crane pads and platforms;
  • Foundation Excavation of Wind Turbine Generators.

Status: Completed
Client: : First Balfour