The Revetment and Heavy Lift Jetty Embankment Package of the Philippine – Mariveles 2x300MW Coal Fired Power Plant Project is located in Brgy. Alas-asin, Mariveles, Bataan.
Main body of works for the heavy lift warf include the construction of two (2) units – 4.975 m x 4.75 m x 5.5 m caissons, the construction of a 100 m extension road connecting the heavy-lift road for the power plant, embankment of 4000 cu.m of riprap stones, rocks and boulders, the construction of precast concrete grid slabs for the slope protection of the embankment, and the construction of two (2) units -2 m x 3 m anchor blocks. This section of the project is expected to be completed by January 15, 2011.
Client: GN Power/THEIDI Construction Co.
Status: Completed